wyszukanych pozycji: 6
High Speed Two (HS2): Infrastructure Design and Construction – 4 volume book set (V1–4)
ISBN: 9780727767004 / Angielski / Twarda / 2023 / 1464 str. Termin realizacji zamówienia: ok. 22 dni roboczych. |
|
cena:
1460,03 zł |
High Speed Two (HS2): Infrastructure Design and Construction – 2 volume book set (V3&4)
ISBN: 9780727767011 / Angielski / Twarda / 2023 / 568 str. Termin realizacji zamówienia: ok. 22 dni roboczych. |
|
cena:
716,50 zł |
Design and Engineering, Volume 3
ISBN: 9780727766892 / Angielski / Twarda / 2023 / 272 str. Termin realizacji zamówienia: ok. 22 dni roboczych. |
|
cena:
410,97 zł |
Architecture, Digital Engineering, Environment and Heritage, Volume 4
ISBN: 9780727766915 / Angielski / Twarda / 2023 / 296 str. Termin realizacji zamówienia: ok. 22 dni roboczych. |
|
cena:
385,29 zł |
High Speed Two (HS2): Infrastructure Design and Construction: Digital Engineering, Environment and Heritage: 2021: 2: Volume 2
ISBN: 9780727765789 / Angielski / Twarda / 2021 / 336 str. Termin realizacji zamówienia: ok. 22 dni roboczych. This volume of High Speed Two: Infrastructure Design and Construction from the HS2 Project, contains a collection of papers submitted to HS2 Ltd's Technical Papers Competition. Contributions have come from consultants, contractors, suppliers and third-party stakeholders involved in developing the planned infrastructure of the HS2 project. As part of HS2's Learning Legacy commitment, the organisation seeks to share its learnings and best practices with the rest of the industry throughout the project lifecycle. Papers in this second volume cover digital engineering, environment and heritage
This volume of High Speed Two: Infrastructure Design and Construction from the HS2 Project, contains a collection of papers submitted to HS2 Ltd's Tec...
|
|
cena:
400,70 zł |
Bundle: High Speed Two (HS2): Infrastructure Design and Construction
ISBN: 9780727766373 / Angielski Termin realizacji zamówienia: ok. 22 dni roboczych. The main construction of HS2, Britain's high-speed rail network, began in September 2020. Phase One will see London to Birmingham linked by trains that can reach 225mph and Phase Two joins Birmingham with Manchester and Leeds. With Phase One consisting of 140 miles of track, 32 miles of tunnels and 10 miles of viaducts, HS2 is the UK's largest ever railway infrastructure building project. These two volumes contain a collection of papers submitted to HS2's Technical Papers Competition, detailing the key infrastructure and design aspects considered for the HS2 Project. Contributions have...
The main construction of HS2, Britain's high-speed rail network, began in September 2020. Phase One will see London to Birmingham linked by trains tha...
|
|
cena:
743,54 zł |