High-rise buildings continue to be built in increasing numbers throughout the world. However, they quickly become impractically expensive if structural needs are not considered early. Similarly attempting to build an irrational design can waste a lot of money. It has been said that 50% of the cost of the structural frame costs are affected by preliminary design, whereas detailed design (e.g. refinement of reinforcement in a reinforced concrete structure) affects a small percentage only. This book discusses what should be considered at the preliminary design stage of a high-rise. The...
High-rise buildings continue to be built in increasing numbers throughout the world. However, they quickly become impractically expensive if structura...