• Wyszukiwanie zaawansowane
  • Kategorie
  • Kategorie BISAC
  • Książki na zamówienie
  • Promocje
  • Granty
  • Książka na prezent
  • Opinie
  • Pomoc
  • Załóż konto
  • Zaloguj się

Machining Productivity Improvement » książka

zaloguj się | załóż konto
Logo Krainaksiazek.pl

koszyk

konto

szukaj
topmenu
Księgarnia internetowa
Szukaj
Książki na zamówienie
Promocje
Granty
Książka na prezent
Moje konto
Pomoc
 
 
Wyszukiwanie zaawansowane
Pusty koszyk
Bezpłatna dostawa dla zamówień powyżej 20 złBezpłatna dostawa dla zamówień powyżej 20 zł

Kategorie główne

• Nauka
 [2949965]
• Literatura piękna
 [1857847]

  więcej...
• Turystyka
 [70818]
• Informatyka
 [151303]
• Komiksy
 [35733]
• Encyklopedie
 [23180]
• Dziecięca
 [617748]
• Hobby
 [139972]
• AudioBooki
 [1650]
• Literatura faktu
 [228361]
• Muzyka CD
 [398]
• Słowniki
 [2862]
• Inne
 [444732]
• Kalendarze
 [1620]
• Podręczniki
 [167233]
• Poradniki
 [482388]
• Religia
 [509867]
• Czasopisma
 [533]
• Sport
 [61361]
• Sztuka
 [243125]
• CD, DVD, Video
 [3451]
• Technologie
 [219309]
• Zdrowie
 [101347]
• Książkowe Klimaty
 [123]
• Zabawki
 [2362]
• Puzzle, gry
 [3791]
• Literatura w języku ukraińskim
 [253]
• Art. papiernicze i szkolne
 [7933]
Kategorie szczegółowe BISAC

Machining Productivity Improvement

ISBN-13: 9783659389610 / Angielski / Miękka / 2013 / 120 str.

Goel Bhaskar
Machining Productivity Improvement Goel Bhaskar 9783659389610 LAP Lambert Academic Publishing - książkaWidoczna okładka, to zdjęcie poglądowe, a rzeczywista szata graficzna może różnić się od prezentowanej.

Machining Productivity Improvement

ISBN-13: 9783659389610 / Angielski / Miękka / 2013 / 120 str.

Goel Bhaskar
cena 246,14 zł
(netto: 234,42 VAT:  5%)

Najniższa cena z 30 dni: 246,14 zł
Termin realizacji zamówienia:
ok. 10-14 dni roboczych
Bez gwarancji dostawy przed świętami

Darmowa dostawa!

Improvement of productivity is need of the hour for overall growth and development of an organization. The present work deals with a problem of low production tractor industry. The machining operation being one of the most important stages in manufacturing of various components has been focused in the present work. A thorough study of existing process plan revealed that there is enough scope of improvement in cycle time by modifying fixtures and cutting tools. The study has been carried out by identifying the machining of two critical components. About 30% Cycle time has been reduced by modifying jigs & fixtures and by implementing latest cutting tools. Fixture has been modified to accommodate 8 Cylinder Heads at time, Cutting tools with improved geometry and TiAlN coating. After implementing the modifications 41 % improvement in machining productivity has been achieved for Cylinder Head and 20% reduction in machining cost of one Cylinder Head. Machining cost of one Main Transmission Housing has been reduced by 16%.Further this study has resulted in annual savings of approx. Rs. 6.5 lakh and Rs.5 lakh in case of Cylinder Head and Main Transmission Housing respectively.

Improvement of productivity is need of the hour for overall growth and development of an organization. The present work deals with a problem of low production tractor industry. The machining operation being one of the most important stages in manufacturing of various components has been focused in the present work. A thorough study of existing process plan revealed that there is enough scope of improvement in cycle time by modifying fixtures and cutting tools. The study has been carried out by identifying the machining of two critical components. About 30% Cycle time has been reduced by modifying jigs & fixtures and by implementing latest cutting tools. Fixture has been modified to accommodate 8 Cylinder Heads at time, Cutting tools with improved geometry and TiAlN coating. After implementing the modifications 41 % improvement in machining productivity has been achieved for Cylinder Head and 20% reduction in machining cost of one Cylinder Head. Machining cost of one Main Transmission Housing has been reduced by 16%.Further this study has resulted in annual savings of approx. Rs. 6.5 lakh and Rs.5 lakh in case of Cylinder Head and Main Transmission Housing respectively.

Kategorie:
Technologie
Kategorie BISAC:
Technology & Engineering > Engineering (General)
Wydawca:
LAP Lambert Academic Publishing
Język:
Angielski
ISBN-13:
9783659389610
Rok wydania:
2013
Ilość stron:
120
Waga:
0.18 kg
Wymiary:
22.86 x 15.24 x 0.71
Oprawa:
Miękka
Wolumenów:
01
Dodatkowe informacje:
Wydanie ilustrowane

Working as Associate Professor in Department of Mechanical Engineering at Shoolini University, Solan,(INDIA).He is B.Tech.(Honours)from Aligarh Muslim University,M.Tech.(Honours)from Guru Nanak Dev Engineering College, Ludhiana and Pursuing Ph.D from the same College.He is having more than twenty one years of industrial & teaching experience.



Udostępnij

Facebook - konto krainaksiazek.pl



Opinie o Krainaksiazek.pl na Opineo.pl

Partner Mybenefit

Krainaksiazek.pl w programie rzetelna firma Krainaksiaze.pl - płatności przez paypal

Czytaj nas na:

Facebook - krainaksiazek.pl
  • książki na zamówienie
  • granty
  • książka na prezent
  • kontakt
  • pomoc
  • opinie
  • regulamin
  • polityka prywatności

Zobacz:

  • Księgarnia czeska

  • Wydawnictwo Książkowe Klimaty

1997-2025 DolnySlask.com Agencja Internetowa

© 1997-2022 krainaksiazek.pl
     
KONTAKT | REGULAMIN | POLITYKA PRYWATNOŚCI | USTAWIENIA PRYWATNOŚCI
Zobacz: Księgarnia Czeska | Wydawnictwo Książkowe Klimaty | Mapa strony | Lista autorów
KrainaKsiazek.PL - Księgarnia Internetowa
Polityka prywatnosci - link
Krainaksiazek.pl - płatnośc Przelewy24
Przechowalnia Przechowalnia