• Wyszukiwanie zaawansowane
  • Kategorie
  • Kategorie BISAC
  • Książki na zamówienie
  • Promocje
  • Granty
  • Książka na prezent
  • Opinie
  • Pomoc
  • Załóż konto
  • Zaloguj się

Optimisation of Rock Support in Headrace Tunnel using Phase2 » książka

zaloguj się | załóż konto
Logo Krainaksiazek.pl

koszyk

konto

szukaj
topmenu
Księgarnia internetowa
Szukaj
Książki na zamówienie
Promocje
Granty
Książka na prezent
Moje konto
Pomoc
 
 
Wyszukiwanie zaawansowane
Pusty koszyk
Bezpłatna dostawa dla zamówień powyżej 20 złBezpłatna dostawa dla zamówień powyżej 20 zł

Kategorie główne

• Nauka
 [2939893]
• Literatura piękna
 [1808953]

  więcej...
• Turystyka
 [70366]
• Informatyka
 [150555]
• Komiksy
 [35137]
• Encyklopedie
 [23160]
• Dziecięca
 [608786]
• Hobby
 [136447]
• AudioBooki
 [1631]
• Literatura faktu
 [225099]
• Muzyka CD
 [360]
• Słowniki
 [2914]
• Inne
 [442115]
• Kalendarze
 [1068]
• Podręczniki
 [166599]
• Poradniki
 [468390]
• Religia
 [506548]
• Czasopisma
 [506]
• Sport
 [61109]
• Sztuka
 [241608]
• CD, DVD, Video
 [3308]
• Technologie
 [218981]
• Zdrowie
 [98614]
• Książkowe Klimaty
 [124]
• Zabawki
 [2174]
• Puzzle, gry
 [3275]
• Literatura w języku ukraińskim
 [260]
• Art. papiernicze i szkolne
 [7376]
Kategorie szczegółowe BISAC

Optimisation of Rock Support in Headrace Tunnel using Phase2

ISBN-13: 9783659637285 / Angielski / Miękka / 2014 / 128 str.

K. C. Nishant
Optimisation of Rock Support in Headrace Tunnel using Phase2 K. C. Nishant 9783659637285 LAP Lambert Academic Publishing - książkaWidoczna okładka, to zdjęcie poglądowe, a rzeczywista szata graficzna może różnić się od prezentowanej.

Optimisation of Rock Support in Headrace Tunnel using Phase2

ISBN-13: 9783659637285 / Angielski / Miękka / 2014 / 128 str.

K. C. Nishant
cena 178,47
(netto: 169,97 VAT:  5%)

Najniższa cena z 30 dni: 178,06
Termin realizacji zamówienia:
ok. 10-14 dni roboczych.

Darmowa dostawa!

This book outlines the stability analysis and rock support optimisation of headrace tunnel of Mai hydropower project in Nepal. The geology and the geo-technical parameters are comparatively poor at the project area as the headrace tunnel lies in Siwalik zone of Nepal consisting of Mudstone, Siltstone, Sandstone and shear zones. And also, Rock support defined during feasibility study of the project was inadequate for which this work has suggested some improvements in the support system of the headrace tunnel. The main objective of this study were to analyse the engineering geology and geotechnical parameters of the alignment and subsequently verify the stability and rock support design using two dimensional numerical modelling program "Phase2" with other two supporting software called "UNWEDGE" and "Rock Data." The tunnel alignment was divided into eight different sections considering the rock type and rock overburden. The two dimensional model was created representing each section in the alignment to analyse the elasto-plastic behaviour of Rockmass. Further, hydraulic fracturing assessment has also been carried out to know the effect of water pressure inside the tunnel.

This book outlines the stability analysis and rock support optimisation of headrace tunnel of Mai hydropower project in Nepal. The geology and the geo-technical parameters are comparatively poor at the project area as the headrace tunnel lies in Siwalik zone of Nepal consisting of Mudstone, Siltstone, Sandstone and shear zones. And also, Rock support defined during feasibility study of the project was inadequate for which this work has suggested some improvements in the support system of the headrace tunnel. The main objective of this study were to analyse the engineering geology and geotechnical parameters of the alignment and subsequently verify the stability and rock support design using two dimensional numerical modelling program "Phase2" with other two supporting software called "UNWEDGE" and "Rock Data". The tunnel alignment was divided into eight different sections considering the rock type and rock overburden. The two dimensional model was created representing each section in the alignment to analyse the elasto-plastic behaviour of Rockmass. Further, hydraulic fracturing assessment has also been carried out to know the effect of water pressure inside the tunnel.

Kategorie:
Technologie
Kategorie BISAC:
Technology & Engineering > General
Wydawca:
LAP Lambert Academic Publishing
Język:
Angielski
ISBN-13:
9783659637285
Rok wydania:
2014
Ilość stron:
128
Waga:
0.20 kg
Wymiary:
22.86 x 15.24 x 0.76
Oprawa:
Miękka
Wolumenów:
01

Nishant KC is a Civil Engineer with MSc in Hydropower development from Norwegian University of Science and Technology(NTNU). He has been working in hydropower sector since 2006.



Udostępnij

Facebook - konto krainaksiazek.pl



Opinie o Krainaksiazek.pl na Opineo.pl

Partner Mybenefit

Krainaksiazek.pl w programie rzetelna firma Krainaksiaze.pl - płatności przez paypal

Czytaj nas na:

Facebook - krainaksiazek.pl
  • książki na zamówienie
  • granty
  • książka na prezent
  • kontakt
  • pomoc
  • opinie
  • regulamin
  • polityka prywatności

Zobacz:

  • Księgarnia czeska

  • Wydawnictwo Książkowe Klimaty

1997-2026 DolnySlask.com Agencja Internetowa

© 1997-2022 krainaksiazek.pl
     
KONTAKT | REGULAMIN | POLITYKA PRYWATNOŚCI | USTAWIENIA PRYWATNOŚCI
Zobacz: Księgarnia Czeska | Wydawnictwo Książkowe Klimaty | Mapa strony | Lista autorów
KrainaKsiazek.PL - Księgarnia Internetowa
Polityka prywatnosci - link
Krainaksiazek.pl - płatnośc Przelewy24
Przechowalnia Przechowalnia