ISBN-13: 9781503311794 / Angielski / Miękka / 2015 / 36 str.
ISBN-13: 9781503311794 / Angielski / Miękka / 2015 / 36 str.
On 6 April, drilling operations were continuing on the Well, and conductor casing had been set and cemented. While waiting on cement, the rig crew nippled down the diverter, cut the pipe, and welded on the casing head. The crew rigged down the surface lines and rigged up the chain, swivel, shackle, and hoist, preparing to reconnect the diverter.