ISBN-13: 9786139859610 / Angielski / Miękka / 2018 / 52 str.
IIn industry today, the need for excellent product development and realization in many different aspects is increasing. This calls for excellent quality, while at the same time time-to-market is increasingly important. A concurrent engineering (CE) approach is directed towards simultaneously developing different aspects of product realization in order to enhance both quality and speed. This thesis deals with the internal materials supply system (MSS) from a CE approach. Logistics aspects are often not dealt with until later stages of development, which leads to limitations in the possible solutions for the MSS. While designing a new production system, including MSS aspects early on in the project implies stating at an early stage what is required by the system. In order to aid the development of such requirements, this thesis aims at suggesting a structure for the requirements on the MSS where the relevant stakeholders of the system are involved. The thesis results are achieved through literature reviews and a case study at a manufacturing company in the automotive industry.